Skip to content
V.S. Heat Treatment logoV.S.Heat Treatment
Metallurgy

Preparing Parts Before Plating: A Guide for Fastener Makers (OEM)

Good part preparation before plating yields a clean, uniform result with fewer problems. Here is what OEM fastener shops should know.

6 min read · Updated April 17, 2026

One plant in Samut Sakhon, ThailandSmall steel parts in bulk — screws, nuts, boltsQuote within 24 hours

A shallow-depth-of-field close-up of dark grey Phillips-head self-tapping screws heaped together.
Self-tapping screws waiting to go in. The condition they arrive in — oil, rust — decides what the pre-treatment has to remove.

Cleanliness and surface condition

Oil, swarf, rust or forming residues directly affect how well the coating adheres.

We run a cleaning stage, but parts that arrive in good condition give a more uniform result.

Information to send with the job

  • Material grade (e.g. S45C, SCM435) and current condition.
  • The process wanted and target values (HRC, thickness in µm, colour, salt-spray hours).
  • Tolerances/features to watch—threads or holes that must not bind.
  • Quantity/weight and due date.

Tips to avoid problems

Tight-tolerance hardened parts should allow stock for distortion/grinding.

Fine threads that might bind: flag them so we control coating thickness.

Send a first article before full production to confirm the result before the big lot runs.

FAQ

Should I clean parts first?+

We clean them, but please remove heavy grime/unusual rust first for a uniform result.

Do I need to state the steel grade?+

Please do—it affects achievable hardness and process choice; if unknown, we can analyze it.

Can I get a sample first?+

Yes—a first article is recommended to confirm colour/thickness/hardness before the big lot.

Share this pageLINEFacebook

Technical content review

Reviewed by the V.S. Heat Treatment QA and production team—heat-treatment and finishing operations since 1994 under an ISO 9001:2015 quality system.

View evidence and report format

Need a metal-plating expert?

Our engineers reply with a tailored quote within 24 hours.